80 Insight | Space rotorcraft antenna when the rotorcraft is stationary and lower it into a locking mechanism before Dragonfly takes off again. “Every time the lander prepares to fly to another location, we store the antenna so it survives the vibrations created during flight and prevents resonance that could interfere with the rest of the lander,” says Jackson Banbury, Dragonfly telecommunications mechanical and thermal lead at APL. The antenna and its gimbal are designed and tested to endure the rigours of Titan’s environment, including frigid temperatures that average around −179 C, swirling dust on the surface and potentially liquid methane rain. Vibration and sealing tests are designed to show that the fuselage’s structural backbone can withstand the loads of launch, entry through Titan’s atmosphere and landing on the surface of this ocean world. For vibration testing, the team installed mass simulators in place of the flight instruments and electronics being built and tested elsewhere. The ground vibration test gave the team a fleeting preview of Dragonfly in the air. Engineers used long bungee cords to suspend the rotorcraft’s structure a few centimetres off the ground, and then measured how mechanical vibrations at the rotor locations travelled through the frame to key sensors on the main body. “Suspended for a few hours during that test – even barely above the floor – was structurally akin to Dragonfly’s first flight,” says Gordon Maahs, the Dragonfly mechanical systems engineer from APL. “It gets the imagination going about what actual flight will look like.” The test also included a ‘sit down’ configuration, whereby the lander was lowered onto protective padding so that it rested on its skids while engineers measured how the structure would respond on Titan’s surface. Most planetary spacecraft are built for the vacuum of space or worlds with thin atmospheres. But Dragonfly is headed to Titan, where the surface atmosphere is dense, cold and about 1.5 times the pressure of that on Earth, so engineers needed to understand how well the assembled structure could keep that environment out. The solution: pressurise Dragonfly’s outer structure to identify any gaps, cracks or holes that could allow air to flow in and/or out of the lander on Titan. “I’ve never seen a test like it on any other spacecraft,” Maahs says. “We get a total flow rate based off of the sealing test, and that feeds our thermal analysis to determine if we’re sealed enough.” Instruments The Dragonfly mass spectrometer (DraMS) is being developed by NASA’s Goddard Space Flight Center and the Centre National d’Etudes Spatiales in France, while a gamma-ray and neutron spectrometer, which will be used to measure elemental surface composition including minor inorganics and classify surface materials, is being developed by Johns Hopkins APL and Lawrence Livermore National Laboratory. A camera suite developed by Malin Space Science Systems in San Diego, California (USA), will characterise landforms and surface processes at multiple scales through surface and aerial imaging, and the rotorcraft includes a system to drill, sample and pneumatically transfer surface material to the DraMS. This is being developed by Honeybee Robotics, which is a Blue Origin company. Testing of the foam coating that will insulate the rotorcraft from Titan’s frigid temperatures continues in the Titan Chamber at APL. The flight radio has been delivered, and additional flight systems are scheduled for delivery and testing within the next six months. Dragonfly integration and testing will continue at APL through 2026 and into early 2027, when system-level testing is planned at Lockheed Martin. Later in 2027, the lander will return to APL for final space-environment testing before heading to NASA’s Kennedy Space Centre in Florida (USA) in spring 2028 for launch aboard a SpaceX Falcon Heavy rocket. “We’ve spent years designing and refining this amazing rotorcraft on computer screens and in laboratories, and now we get to bring all those elements together and transform Dragonfly into an actual flight system,” says Annette Dolbow, the Dragonfly integration and test lead at APL. October/November 2026 | Uncrewed Systems Technology Clockwise from centre: Joe Minty, Ben Thistle, Sam Rutan-Weeks, Carlisa Drew, Jackie Perry, Erika Dorsey and Alan Busbey connect sections of electrical wiring harness to components inside NASA’s Dragonfly rotorcraft lander in a clean room at the Johns Hopkins APL (Image: NASA / Johns Hopkins APL / Ed Whitman)
RkJQdWJsaXNoZXIy MjI2Mzk4